DESCRIPTION
PPS Energy & Marine Co., Ltd. intended to construct a new raw water pipeline from Si Yat Reservoir to Amata Industrial Estate and required Pro-En to provide a survey and preliminary study of pipeline route for the Project. In addition, required Pro-En to verify the capacity of the pond (50 rai and 100 rai)